Integrated Structural Integrity Solutions
Structural Integrity Assessment
Determine whether the structure is fit for purpose—and what should happen next
Fidelis Aerospace integrates structural analysis, fatigue, fracture mechanics, damage tolerance, test and inspection evidence, operating history, and uncertainty to help aerospace and defense teams understand structural risk and make defensible engineering decisions.
Table of Contents
Structural integrity is established by integrating the evidence
No single stress margin, finite element model, fatigue calculation, test result, or inspection finding establishes structural integrity by itself.
A defensible conclusion may depend on several forms of evidence: the intended function of the structure, its configuration and loading, credible failure modes, repeated-use demands, detected or assumed damage, test and inspection results, operating history, and the uncertainty within the technical basis.
A Structural Integrity Assessment brings these elements together to answer three essential questions.
What governs?
Identify the failure mode, structural location, load, assumption, operating condition, or evidence gap controlling the conclusion.
What does the evidence support?
Determine what can reasonably be concluded from the available analysis, physical evidence, usage information, and engineering basis.
What should happen next?
Establish a clearer basis for continued operation, redesign, repair, inspection, testing, additional analysis, life extension, or another program action.
The purpose is not simply to produce more analysis. It is to understand what the technical evidence means and convert that understanding into a defensible path forward.
SECTION 1 When an integrated assessment is needed
Separate analyses do not always provide a complete answer
A structure can pass a static-strength check and still face an unacceptable fatigue, fracture, inspection, or usage-related risk.
It can also appear deficient in one analysis while refined loading, test evidence, inspection results, or a better understanding of the governing failure mode supports a different conclusion.
The difficult part is often not producing another model or calculation. It is determining how the available evidence fits together, which assumptions materially influence the result, what remains uncertain, and what conclusion is justified for the decision at hand.
An integrated assessment may be appropriate when any of the following conditions exist.
The analysis is fragmented
Strength, finite element analysis, fatigue, fracture, test, and inspection work may have been performed separately, using different assumptions or without an integrated conclusion.
Each analysis may be useful while still failing to establish a coherent structural-risk picture.
The operating basis has changed
The structure may be expected to operate beyond its original life objective or under a different mission, load spectrum, environment, duty cycle, or configuration.
Repairs, modifications, damage, exceedances, or changes in use may also alter the original integrity basis.
Physical evidence has changed the problem
A crack, deformation, test anomaly, inspection indication, failed part, or unexpected strain response may require the existing analytical basis to be reconsidered.
The evidence does not agree
Analytical predictions, test results, inspection findings, and observed hardware behavior may point toward different explanations.
The discrepancy may originate in the loads, boundary conditions, geometry, material behavior, instrumentation, model idealization, assumed failure mechanism, or interpretation of the evidence.
The governing risk is unclear
The team may recognize several possible concerns but lack a defensible basis for determining which condition, failure mechanism, assumption, or uncertainty controls.
A major decision is approaching
The program may need to support:
- A design release or major design commitment
- Preliminary or critical design review
- Qualification or customer review
- Repair or nonconformance disposition
- Continued-operation approval
- Inspection planning
- Service-life extension
- A test or evidence-development decision
Senior specialist capacity is limited
The internal organization may have capable engineers but lack the time, independence, or structural-integrity depth needed to integrate the complete technical case.
A Structural Integrity Assessment is most valuable when the decision depends on the complete evidence—not merely the result of one analysis.
Key takeaway
A Structural Integrity Assessment is appropriate when the decision depends on the complete evidence—not merely the result of one analysis.
SECTION 2 Questions and decisions the assessment supports
Begin with the decision that must be made
The appropriate assessment depends on why the work is being performed.
A design-review decision may require a different level of evidence than a response to a discovered crack. A supplier addressing a customer finding may need a different scope than a sustainment organization evaluating extended operation.
Before selecting methods or building models, the assessment should clarify the decision, the applicable requirements, the consequence of being wrong, and the level of confidence required.
Structural adequacy
The assessment may help determine:
- Whether the structure is adequate for its intended loading and environment
- How the structure carries load
- Which failure modes are credible
- Which locations and load cases govern
- What margins exist
- Which assumptions control those margins
- Whether local findings are consistent with system-level behavior
Durability and service life
The assessment may address:
- How repeated use influences structural risk
- Which locations are most susceptible to fatigue
- Whether the load spectrum represents actual or planned operation
- How sensitive predicted life is to loading, material behavior, geometry, or other assumptions
- Whether the available evidence supports the intended service-life objective
Damage and fracture risk
When a detected or assumed flaw is relevant, the assessment may consider:
- The significance of the flaw
- The flaw size or condition that becomes critical
- How damage may grow under expected loading
- The residual strength of the structure
- Whether inspection, repair, monitoring, or operational action is appropriate
Test and inspection evidence
The assessment may help answer:
- Whether test results are consistent with the analytical model
- What mechanisms could explain a discrepancy
- Whether inspection findings change the assumed failure mode or life basis
- Whether the measured quantities support the intended conclusion
- What additional evidence would most effectively reduce uncertainty
Usage, configuration, and history
The assessment may evaluate:
- Whether the current configuration matches the analytical basis
- Whether repairs, modifications, exceedances, or mission changes have altered structural risk
- Whether the structure is operating within the assumptions used for substantiation
- Whether prior service experience supports or challenges the existing conclusion
Confidence and uncertainty
The assessment should also make clear:
- Which assumptions materially influence the result
- Which inputs are well supported
- Which inputs remain uncertain
- Whether separate analyses rely on the same underlying evidence
- Which uncertainties can reasonably be bounded
- Which missing information prevents a responsible conclusion
Decisions an assessment may support
Depending on the situation, the work may provide a technical basis to:
- Proceed within the current operating basis
- Proceed with limitations or monitoring
- Perform focused supplemental analysis
- Refine loads, boundary conditions, or structural models
- Redesign or reinforce the structure
- Develop a repair basis
- Perform additional testing
- Establish or revise an inspection plan
- Restrict operation until additional evidence is available
- Extend service life within defined conditions
- Close technical-review findings
- Develop a longer-term structural risk-reduction plan
A useful assessment should explain what governs, what the evidence supports, how confident the conclusion is, what remains uncertain, and what action is recommended.
SECTION 3 Evidence that defines structural integrity
Structural integrity is an evidence-integration problem
A credible assessment begins by defining the evidence required for the decision.
Not every engagement requires every category of information. The objective is to identify which evidence domains are relevant, what information is already available, and which gaps materially affect the conclusion.
Decision context
The decision context establishes why the assessment exists and how much evidence is necessary.
It may include:
- Intended function
- Structural and performance requirements
- Operating environment
- Service-life objective
- Consequence of failure
- Program maturity
- Review, qualification, or certification context
- Decision authority
- Schedule
- Required level of confidence
The rigor of the assessment should match the maturity and consequence of the decision.
Design basis and structural response
The structural basis establishes what the hardware is, how it is loaded, and how it is expected to behave.
Relevant information may include:
- Geometry and configuration
- Materials and allowables
- Interfaces and joints
- Loads and load combinations
- Boundary conditions
- Load paths
- Stress and deformation
- Stability
- Local and global failure modes
- Margins
- Model idealization
- Calculation and model verification
The objective is not merely to collect results. It is to determine whether the analytical representation is physically consistent with the structure and the decision being supported.
Life and damage
Repeated loading, material behavior, flaws, and damage can change the integrity conclusion even when static strength appears acceptable.
Relevant evidence may include:
- Duty cycles and load spectra
- Fatigue-critical locations
- Stress concentrations
- Stress-life or strain-life assessments
- Cumulative damage
- Detected or assumed flaws
- Crack-growth behavior
- Critical crack size
- Residual strength
- Damage tolerance
- Detectability
- Inspection intervals
When the problem requires it, strength, fatigue, and fracture should be treated as connected parts of the same decision.
Test and inspection evidence
Physical evidence provides information about actual structural response and condition.
Relevant information may include:
- Structural or component test data
- Measured loads, strains, deflections, or accelerations
- Instrumentation locations and uncertainty
- Fixtures and load introduction
- Test anomalies
- Nondestructive inspection findings
- Damage dimensions and locations
- Photographs and hardware observations
- Failure surfaces
- Repeatability and data quality
The assessment considers how the evidence was produced, what it directly demonstrates, and what conclusions it does not support.
Usage, configuration, and history
The structure that exists in service may differ from the original analytical configuration or operating basis.
Relevant information may include:
- Actual mission or duty history
- Load exceedances
- Environmental exposure
- Repairs
- Modifications
- Configuration changes
- Manufacturing deviations
- Nonconformances
- Maintenance actions
- Inspection history
- Prior damage
- Fleet or service experience
A valid integrity conclusion must correspond to the structure’s actual or proposed configuration and use.
Assumptions, data quality, and uncertainty
Every structural conclusion is conditioned on the evidence behind it.
The assessment should identify:
- Missing or incomplete information
- Data variability
- Material scatter
- Modeling idealizations
- Measurement uncertainty
- Load uncertainty
- Usage uncertainty
- Sensitivity to key assumptions
- Method limitations
- Unsupported precision
- Confidence in the resulting conclusion
Uncertainty is not simply a reason to stop. It is information that should shape the conclusion, the recommended action, and the need for additional evidence.
Engineering integration
The evidence does not become a structural integrity conclusion until it is interpreted through mechanics, verification, reconciliation, sensitivity analysis, uncertainty evaluation, and experienced engineering judgment.
The integration process should distinguish among:
- Confirmed findings
- Supported interpretations
- Plausible but unverified explanations
- Decision-critical unknowns
- Lower-priority information gaps
The quality of a structural integrity conclusion depends not only on the amount of evidence available, but on how consistently and responsibly that evidence is connected.
Key takeaway
The quality of a structural integrity conclusion depends not only on the amount of evidence available, but on how consistently and responsibly that evidence is connected.
SECTION 4 Scope and related services
A scope shaped by the decision
A Structural Integrity Assessment is not a predetermined package of calculations.
The scope should be based on:
- The decision that must be supported
- The consequence of that decision
- The maturity and quality of the existing technical basis
- The credible failure mechanisms
- The available evidence
- The uncertainty that must be resolved
- The client’s schedule and program constraints
Some engagements primarily integrate and challenge existing work. Others require focused supplemental analysis to resolve specific evidence gaps.
The scope should be no larger than necessary, but complete enough to support the decision responsibly.
Potential areas of assessment
Depending on the problem, the work may include:
Decision and requirement definition
- Clarifying the intended engineering decision
- Reviewing requirements and acceptance criteria
- Defining the applicable configuration
- Establishing operating, environmental, and life objectives
- Identifying the required level of evidence
Structural mechanics and strength
- Load-path assessment
- Free-body diagrams and classical calculations
- Section, joint, fitting, and interface evaluation
- Static-strength assessment
- Stability and local-failure evaluation
- Margin assessment
- Sensitivity studies
Finite element analysis
- Existing-model review
- Model idealization and verification
- Boundary-condition and load review
- Linear static analysis
- Contact or thermal-structural evaluation where appropriate
- Selected nonlinear or dynamic analysis when supported by the problem and available tools
- Structural-response interpretation
- Focused model refinement
Fatigue and durability
- Hotspot identification
- Load-spectrum review
- Stress-life or other appropriate life methods
- Cumulative-damage assessment
- Life sensitivity
- Governing-location identification
- Durability improvement recommendations
Fracture mechanics and damage tolerance
- Crack-significance assessment
- Stress-intensity evaluation
- Critical crack-size assessment
- Crack-growth analysis
- Residual-strength considerations
- Flaw and loading sensitivity
- Inspection-support analysis
- Damage-tolerance decision support
Test, inspection, and evidence correlation
- Model/test comparison
- Instrumentation and fixture review
- Load and boundary-condition reconciliation
- Inspection-finding interpretation
- Parameter sensitivity
- Plausible-cause evaluation
- Recommendations for additional evidence
Structural risk integration
- Failure-mode assessment
- Evidence-gap identification
- Risk ranking
- Confidence assessment
- Recommendation development
- Technical-review support
- Findings and closure planning
When this service is the right fit
Structural Integrity Assessment is particularly appropriate when:
- Multiple forms of structural evidence must be interpreted together.
- The governing failure mode is uncertain.
- Existing conclusions are fragmented or conflicting.
- Test, inspection, damage, usage, or repair information has changed the problem.
- The decision concerns qualification, life extension, repair, or continued operation.
- The client needs an integrated technical basis rather than an isolated analysis result.
Related services
Structural Analysis and Finite Element Analysis
Appropriate when the primary question concerns loads, structural response, failure modes, stresses, deformation, stability, or margins.
Fatigue Life and Durability Assessment
Appropriate when the primary question concerns life under repeated loading before a detected or assumed flaw becomes the governing concern.
Fracture Mechanics and Damage Tolerance
Appropriate when the central concern is a detected or assumed flaw, critical crack size, crack growth, residual strength, or inspection interval.
FEA Correlation and Test Support
Appropriate when the primary issue is disagreement between analytical prediction and physical test evidence.
Independent Technical Review and Structural Advisory
Appropriate when the principal need is an objective review of existing work, preparation for a major review, or continuing access to senior structural judgment.
Scope boundaries
Unless expressly included through a defined scope and suitable resources, the service does not imply:
- Generic FEA model production without a defined engineering decision
- Full multidisciplinary vehicle certification
- Regulatory approval or delegated certification authority
- Physical testing performed directly by Fidelis
- Nondestructive inspection execution
- Production drawing-release authority
- Open-ended staff augmentation
- Conclusions unsupported by the quality of the available data
- Capabilities, methods, tools, or facilities not available for the engagement
Selected analysis, test support, inspection planning, repair, or redesign activities may be included in the engagement or coordinated with the client and qualified partners.
SECTION 5 A physics-first engineering approach
Begin with the physical problem—not the software workflow
Fidelis begins with the decision and the mechanics of the structure rather than a predetermined software package or analysis process.
Methods are selected according to the problem, credible failure mechanisms, available evidence, required confidence, schedule, and consequence of the decision.
1. Frame the decision
Clarify:
- What decision must be made
- Who must rely on the conclusion
- What consequences are associated with being wrong
- Which requirements and acceptance criteria apply
- Which configuration and operating basis are relevant
- What evidence is available
- What schedule governs
- What level of confidence is appropriate
Outcome: A defined assessment question, decision context, scope, and evidence plan.
2. Establish the technical basis
Review and reconcile:
- Geometry and configuration
- Materials and allowables
- Loads and boundary conditions
- Usage and environment
- Models and calculations
- Test and inspection evidence
- Damage and repair history
- Credible failure mechanisms
- Assumptions and limitations
- Existing findings and open questions
Outcome: A coherent technical basis and a prioritized list of evidence gaps.
3. Analyze, verify, and challenge
Apply methods appropriate to the problem while:
- Checking load paths and physical behavior
- Evaluating credible failure modes
- Verifying calculations and models
- Comparing classical and numerical methods where appropriate
- Testing sensitive assumptions
- Comparing independent evidence
- Investigating conflicting results
- Characterizing uncertainty
- Distinguishing supported conclusions from unsupported precision
The level of analysis should be sufficient to answer the decision—not more elaborate merely for the sake of complexity.
Outcome: Supported findings, governing conditions, and a clear understanding of remaining uncertainty.
4. Convert findings into action
Communicate:
- What is known
- What remains uncertain
- What governs
- What the evidence supports
- How confident the conclusion is
- What actions should be taken
- What work is optional
- What work is decision-critical
- What limitations apply
Outcome: Decision-ready findings, recommendations, priorities, and a defensible path forward.
An iterative process
Structural integrity is not necessarily established once and left unchanged.
A design revision, repair, inspection result, test result, usage change, load exceedance, configuration change, or new requirement may require the technical basis to be updated.
The assessment should make these dependencies visible so the client understands when the conclusion remains valid and what conditions require reconsideration.
SECTION 6 Engagement options
Begin at the level the decision requires
A structural integrity engagement does not always need to begin as a large analysis program.
The first step may be a bounded diagnostic that clarifies the problem and identifies the most valuable next action. A more comprehensive assessment or continuing advisory relationship can follow when the decision requires it.
Structural Integrity Diagnostic
A focused initial engagement for situations that are urgent, unclear, or not yet ready for a larger assessment.
Appropriate when
- Multiple analyses or evidence sources require review.
- The governing concern has not been identified.
- Leadership needs an initial structural-risk picture.
- The immediate question is what should be done next.
Typical scope
- Technical kickoff
- High-level evidence review
- Decision-context definition
- Preliminary identification of credible failure modes
- Review of major assumptions
- Evidence-gap assessment
- Preliminary risk ranking
- Recommendation of the next technical action
Typical output
- Concise technical memorandum or briefing
- Preliminary findings
- Key assumptions and uncertainties
- Priority evidence gaps
- Recommended actions
- Proposed scope for deeper assessment where warranted
Integrated Structural Integrity Assessment
A documented, multidisciplinary assessment for decisions that require a complete and traceable structural-integrity basis.
Appropriate when
- Multiple disciplines or evidence sources must be reconciled.
- The client needs a complete integrity conclusion.
- The decision affects qualification, life extension, repair, continued operation, or a major design commitment.
- Existing work requires supplemental analysis.
- The consequence justifies a documented technical basis.
Typical scope
- Decision and requirement framing
- Detailed evidence review
- Failure-mode assessment
- Focused structural, fatigue, fracture, damage-tolerance, or correlation analysis
- Sensitivity and uncertainty evaluation
- Integrated structural-risk assessment
- Recommendation development
- Technical review and briefing support
Typical output
- Integrated structural integrity assessment report
- Supporting calculations or models
- Verification and sensitivity evidence
- Assumptions and evidence-gap summary
- Risk and confidence assessment
- Recommended actions
- Technical briefing
Structural Integrity Advisory Support
Ongoing access to senior structural judgment for issues that evolve across several design, test, review, or operational cycles.
Appropriate when
- Several specialist work packages must remain integrated.
- Findings require continuing review and closure.
- The client needs periodic access to senior expertise.
- The internal team needs guidance without adding a full-time specialist.
Typical support
- Recurring technical reviews
- Analysis planning
- Structural decision support
- Findings and closure guidance
- Integration among strength, fatigue, fracture, test, and design activities
- Review preparation
- Technical coaching and mentoring
- Risk and priority discussions with engineering or program leadership
This is structured technical advisory support. It is not unrestricted staff augmentation, delegated approval authority, or a substitute for the client’s engineering organization.
SECTION 7 Inputs and deliverables
Information that helps establish the integrity basis
Useful information may include:
- Component, assembly, or system description
- Drawings, CAD geometry, and configuration definition
- Material specifications and allowables
- Loads, load cases, and boundary conditions
- Factors of safety and acceptance criteria
- Usage spectrum, duty cycle, or mission history
- Existing stress reports and calculations
- Finite element models and supporting documentation
- Fatigue, fracture, or damage-tolerance analyses
- Test plans, data, photographs, and instrumentation information
- Inspection findings and damage measurements
- Repair and modification history
- Nonconformance, anomaly, or failure records
- Customer, program, qualification, or review findings
- Applicable requirements and decision criteria
- Decision timing and intended use of the assessment
When information is incomplete
Complete information is not always available, particularly during early design, failure response, sustainment, or rapidly developing programs.
Fidelis can help determine:
- Which missing inputs materially affect the decision
- Which uncertainties can reasonably be bounded
- Which assumptions can be used provisionally
- Which additional data would provide the greatest decision value
- Which conclusions are supportable now
- Which conclusions require additional evidence
Where uncertainty cannot responsibly be resolved, the assessment will state that limitation rather than imply greater confidence than the evidence supports.
Protect sensitive technical information
Do not submit proprietary, export-controlled, controlled unclassified, security-sensitive, or client-restricted technical information through the general website form.
The initial discussion can determine the appropriate confidentiality agreements, cybersecurity environment, data-transfer method, and contractual protections.
Deliverables built around the decision
Depending on scope, deliverables may include:
- Structural integrity diagnostic memorandum
- Integrated structural integrity assessment report
- Failure-mode and structural-risk register
- Assumptions and evidence-gap matrix
- Calculation package
- Structural analysis or finite element model
- Fatigue-life assessment
- Fracture or crack-growth assessment
- Damage-tolerance or inspection-support package
- Model/test correlation findings
- Sensitivity and uncertainty assessment
- Design, repair, test, or inspection recommendations
- Continued-operation or life-extension technical basis
- Review findings and closure recommendations
- Technical or leadership briefing
- Follow-on work plan
The report, calculation, model, or briefing is not the final value by itself.
The deliverable should make clear:
- The decision being supported
- The evidence evaluated
- The assumptions applied
- The methods used
- The governing structural condition
- The level of confidence
- The material uncertainties
- The applicable limitations
- The recommended actions
- The basis for those recommendations
SECTION 8 Why Fidelis Aerospace
Direct access to senior structural-integrity judgment
Fidelis Aerospace is led by an aerospace structural analyst and technical leader with more than two decades of experience supporting aerospace product development, structural analysis, finite element analysis, fatigue, fracture mechanics, test correlation, and high-consequence engineering decisions.
Clients work directly with the senior engineer responsible for framing the problem, selecting the methods, challenging the assumptions, interpreting the evidence, and communicating the findings.
Integrated structural-integrity expertise
Strength, finite element analysis, fatigue, fracture, damage tolerance, testing, inspection, usage, and design are treated as connected parts of the same structural decision.
A result that appears acceptable within one discipline may depend on an assumption, condition, or failure mechanism governed by another.
Physics-first reasoning
Models and calculations are interpreted through:
- Mechanics
- Load paths
- Boundary conditions
- Credible failure modes
- Assumptions
- Verification
- Sensitivity
- Physical evidence
- Uncertainty
- Engineering judgment
Software supports the work. It does not replace understanding.
Decision-centered outcomes
The objective is not simply to create a model, report, or contour plot.
The objective is to establish a defensible answer, risk disposition, design direction, inspection strategy, repair path, evidence plan, or other useful engineering action.
Frequently asked questions
What is a Structural Integrity Assessment?
A Structural Integrity Assessment evaluates whether a structure is fit for its intended purpose by integrating relevant evidence such as loads, strength, structural response, fatigue, fracture mechanics, damage tolerance, test results, inspection findings, operating usage, configuration history, and uncertainty.
The methods depend on the engineering decision that must be supported.
How is this different from a stress analysis or finite element analysis?
Stress analysis and finite element analysis normally address defined parts of the problem, such as loads, structural response, stress, failure modes, or margins.
A Structural Integrity Assessment considers how those results interact with service life, damage, physical evidence, operating history, inspection, uncertainty, and the broader decision.
Does every assessment require new analysis?
No.
Some engagements primarily integrate, review, and challenge existing work. Others require focused calculations, finite element analysis, fatigue assessment, crack-growth analysis, or model/test correlation to close decision-critical evidence gaps.
The scope is driven by the decision rather than by a predetermined analysis package.
Can Fidelis review analyses produced by another organization?
Yes, provided the client has the right to share the information and it can be handled within appropriate contractual, cybersecurity, confidentiality, and export-control requirements.
The review may address assumptions, methods, verification, consistency, credible failure modes, uncertainty, and relevance to the decision.
What happens when important information is missing?
Fidelis can identify which missing information is decision-critical, determine whether uncertainty can reasonably be bounded, recommend targeted data development, and distinguish conclusions that are supportable now from those requiring additional evidence.
Can the work be performed remotely?
Many assessments can be performed remotely when the necessary information can be transferred and handled appropriately.
On-site support may be useful or necessary for hardware examination, testing, controlled-data access, or intensive program reviews.
Does Fidelis perform physical testing or inspections?
Fidelis can support test planning, data interpretation, model/test correlation, inspection planning, and the engineering use of test or inspection evidence.
The service does not imply operation of a test laboratory or direct performance of nondestructive inspection unless those capabilities are expressly established through the engagement and appropriate qualified resources.
Does Fidelis provide certification approval?
Fidelis can support analysis, substantiation, review readiness, qualification activities, and the technical basis used in certification programs.
The service does not imply regulatory approval, delegated certification authority, or sign-off that Fidelis does not formally possess.
What types of structures can be assessed?
The service is intended primarily for aerospace and defense structures, components, joints, fittings, assemblies, and related hardware.
Suitability depends on the material system, structural configuration, failure mechanisms, required methods, available tools, data restrictions, schedule, and professional responsibility.
How does an engagement begin?
The initial technical discussion focuses on the general engineering question, the decision that must be made, the available evidence, the timing, and whether the situation aligns with Fidelis Aerospace’s capabilities.
Detailed technical data can be exchanged later through an appropriate contractual and secure process.
Bring the structural question into focus
When structural evidence is fragmented, conflicting, or incomplete, the first step is to clarify the decision and determine which information will materially change it.
Schedule a technical discussion to review the situation at a high level, determine whether it fits Fidelis Aerospace’s capabilities, and identify an appropriate assessment path.

SHARE